TECHNOLOGY FIT FOR THE FUTURE
The offices at Haymarket Edinburgh are equipped with world-class facilities and a connected and resilient infrastructure. Designed to accommodate businesses looking to the future.
CONNECTIVITY
- Meets requirements for WiredScore Platinum certification – the highest level of resilience for incoming telecommunications
- Built-in 5G technology – integrated and future-proofed
- Two telecom intake rooms – allowing diverse connectivity from multiple data service providers
- Separate dedicated risers provided for diverse connections to each floor if required
- WiFi provided within reception
TECHNOLOGY
- Fully automated BMS
- Intelligent lighting controls linked to daylight and occupancy
- Ventilation designed for occupation density of 1 person/8m2 at 131/s per person
Power
- Resilient electrical supply served from two substations and operating a closed ring main on site serving all buildings
- Secondary electrical supplies for life safety systems
- Full generator back-up with generator connection point on main switchboard
- Dedicated space on roof to install tenant plant if required
- Metering provided to meet BREEAM requirements and allow submetering for two tenants per floor
FIRE SAFETY & SECURITY
- L2 fire alarm system
- Water mist fire suppression system
- CCTV, access control and intruder alarm systems provided in line with Secure by Design
- Intercom and dedicated access to cycle store
Design
- Flexible floor plates – for flexible layouts and working, in line with simple effective organisation of working environments
- Feature lighting to entrance reception and lift lobbies
- 3 x 21-person passenger lifts
- 1 x combined 21-person passenger/goods/firefighting lift
- Lifts operate with destination control in line with BCO requirements for high density offices